الجمعة 21-11-2025 الموافق 1 جمادي الآخرة 1447 شعار الجامعة موقع الجامعة الرسمي
 المركز الدولي لبحوث المياه والبيئه والطاقة (IRCWEE)
صورة المنطقة

اسم المنطقة

وصف المنطقة
See more details


station entrance

Caravans

The station contains several caravans that support its operations. These caravans include: 1. A PLC technology unit for water treatment 2. A water laboratory 3. An operator engineer’s office .

Caravans

The station contains several caravans that support its operations : 1. A training hall funded by BORDA (Bremen Overseas Research and Development Association), established through a Memorandum of Understanding (MoU) with IRCWEE-BAU to promote sanitation structures. 2. A security guard’s cabin (Security Unit). .

Empty land

MEMBRANE

Membrane Bio-reactor is an intricate technology that entails state of art tools of separation. MBR produces high quality effluent that can be used for a wide variety of reuse applications complying with the strictest guidelines. MBR unit is constructed to demonstrate its application as a viable option for decentralized wastewater treatment. The MBR unit was provided by HUBER SE as containerized system. The key element in the whole treatment process is the ultra filtration membranes with a pore size of 38 nanometers..

Reed beds

Sewage sludge requires transport, disposal or further processing, which is becoming an increasing problem in Jordan. Eco-technological sludge treatment performs with the volume reduction and mineralization of municipal sewage sludge without an additional energy input. Sludge Dewatering Reed Beds (SDRB) have been introduced as a new method of sludge treatment in Jordan. At the Demonstration site, two planted (common reed; Phragmites Australis) and 1 unplanted sludge drying bed has been constructed. Anaerobic treatment aims at stabilization of municipal sewage sludge and produce high quality compost residues..

Anaerobic treatment unit-Biogas production

Anaerobic treatment aims at stabilization of municipal sewage sludge and production of high quality fermentation residues. The production of biogas contributes to the competitiveness of the technology. In addition to that, the anaerobic treatment leads to a significant reduction of pathogenic organisms. The company HUBER SE supplied a containerized plant which consists of a mechanical solid/liquid separator (pipe strainer), followed by a hydrolysis reactor and an anaerobic bioreactor..

Sequencing Batch Reactor (SBR

Sequencing Batch Reactor (SBR) is a discontinuously operated fill- and draw activated sludge process. It is uniquely suited for wastewater treatment applications characterized by low or intermittent flow conditions. Three systems have been installed at Fuheis demonstration site conventional SBR plant, an SBR with ultra violet (UV) light and a newly invented Continuous Batch Reactor (CBR). ATB Environmental technology ltd. supplied the three systems. The SBR system at Fuhais consists of two compartments. The first one receives raw wastewater from the inlet tank and used as a preliminary treatment unit. The second compartment receives the preliminary treated wastewater and is considered as a secondary treatment unit, in which all treatment processes occur. The device consists of clear water pump, aerator and de-sludging pump. All the reactors are operated in the mode with feed, anaerobic, aerobic, settling and decanting phases and therefore all biological, oxidation, sedimentation, nitrification and de-nitrification processes occur in a single tank. A newly invented device at ATB Company has also been installed at the demonstration and test site at Fuheis. Continuous Batch Reactor designed to reduce the electrical consumption and O&M work. Tow settling tanks designed in away to separate the suspended solids from the treated water. Aeration, de-sludging and feeding are done by a small compressor. Unlike the SBR system, the water leaves the biological chamber through the settling tanks by gravity to the irrigation tank. The CBR system can be adapted to decentralized application for small units. .

Modified Septic tank

Modified Septic tank is a simple low-cost system. The system was based on modification of conventional septic tank by including an integrated aerated-settling chamber. Two modules of bacterial growth (suspended and attached) are tested for the purpose of treating treat domestic wastewater. Two septic tanks with dual operational conditions (anaerobic and aerobic) are constructed and operated in parallel. Unlike the suspended growth reactor, the anaerobic/aerobic fixed bed reactor contains corrugated plastic sheets, where the microorganisms are attached to the surface of the packing material.

parking

Agricultural Citrus

Due to water scarcity and limited resources in Jordan, the station has successfully utilized treated wastewater for irrigating certain crops, including olives, citrus fruits, and grapes. The treatment is carried out using the latest advanced technologies. We aim to expand the green areas and cultivate them further, making use of the available space at the station for both scientific and practical research purposes.


The Recirculating wetland

The Recirculating Vertical Filter System is a state-of-the art eco-technology designed to produce a high quality effluent within a relatively small foot-print. It consists of a septic tank for primary treatment, followed by a recirculation tank. Effluent is pumped from the recirculation tank onto the vertical filter before then flowing through a flow splitting device from where am portion of the effluent is returned to the recirculation tank while the rest leaves the system and is used for irrigation. The system is designed to treat 2 m³/day (approx. 25 people).

Water harvesting

The water harvesting system at the station aims to maximize the utilization of seasonal rainfall and to build resilience to climate change in the region. The harvested water is used for irrigating crops and expanding the green areas within the station..

Ecotechnologies: Aerated and French Designs

-Combined secondary treatment and disinfection -Saturated operation -Air pump provides oxygen and mixing for increased treatment -Low maintenance requirements

- Combined sludge and wastewater treatment - Raw wastewater applied to one filter at a time - Alternating operation allows sludge to turn into compost

WETLAND multistage

Two Eco-systems-constructed wetlands- have been constructed at the site. The Multi-stage Single-pass Vertical Filter system was designed to produce high quality effluent in a passive way (no electricity or pumps required on a sloping site). It is designed to treat 3.4m3/day (approx. 40 people). The system consists of a septic tank (primary treatment), 1st stage Vertical Filter (secondary treatment and nitrification), Organic Denitrification Reactor (removal of nitrate), and a 2nd stage Vertical Filter (pathogen reduction and further polishing). The vertical filters will be tested with and without wetland plants to see the effect on the performance and .

Clean Energy

A system for generating electrical power using solar energy at Al-Balqa University Station for Excellence in Water, and Environmental Engineering and Technology is an important and effective project for enhancing environmental sustainability, reducing dependence on traditional energy sources, and integrating the use of renewable energy in the station. The British Royal Academy of Engineering (Newton-Khalidi Fund) funded the project with a total capacity of 15 kW, in accordance with the guidelines for the Net Metering system.

Treated water collection tank

   تحت الضوء In the Spotlight
dateicon  14-11-2025
pinnedجدول الامتحانات النصفية كلية التمريض
dateicon  13-11-2025
pinnedمنح في برنامج الدراسات الصيفية في اكاديمية لاهاي للقانون الدولي
dateicon  13-11-2025
pinnedوحدة التعاون والعلاقات الدولية تعلن عن فرصة تبادل طلابي في بولندا للعام الجامعي 2025 / 2026
dateicon  20-11-2025
طوّر مهاراتك في كتابة المحتوى العربي باحتراف   new
dateicon  19-11-2025
جدول الامتحانات النصفية لكلية الهندسة الفصل الدراسي الاول 2026/2025   new
dateicon  19-11-2025
وحدة التعاون والعلاقات الدولية تعلن عن فرصة تبادل طلابي في بولندا للعام الجامعي 2025 / 2026   new
dateicon  19-11-2025
وحدة التعاون والعلاقات الدولية تعلن عن فرصة تبادل طلابي في بولندا للعام الجامعي 2025 / 2026   new
dateicon  18-11-2025
اعلان هام لطلبة المكرمه الملكيه الساميه
dateicon  17-11-2025
مركز التطوير الوظيفي لكليات إقليم الوسط يطلق الدفعة الثامنة والعشرون من فرص العمل لطلبة وخريجي البلقاء التطبيقية ضمن مبادرة (يدًا بيد نحو سوق العمل)

   الخدمات الإلكترونية التابعة للجامعة:
موقع تقييم المدرسين
التقويم الجامعي
أكاديمية البلقاء
التعليم الإلكتروني
الخطط الدراسية
إحسب معدلك
العلامات بواسطة SMS
   الأحداث القادمة والؤتمرات
تشرين الثاني / كانون الأول
22 - 02
القبول والتسجيل
الامتحان النصفي ( Mid Term) لجميع المراحل الدراسية.
22-11-2025 02-12-2025 :: 00:00 - 00:00
الامتحان النصفي ( Mid Term) لجميع المراحل الدراسية.
تشرين الثاني / كانون الأول
30 - 31
القبول والتسجيل
فترة تقديم طلبات الالتحاق لبرامج الدراسات العليا للفصل الدراسي الثاني 2025/2026.
30-11-2025 31-12-2025 :: 00:00 - 00:00
فترة تقديم طلبات الالتحاق لبرامج الدراسات العليا للفصل الدراسي الثاني 2025/2026.
كانون الأول
24
القبول والتسجيل
آخر موعد للانسحاب من مادة أو أكثر أو من جميع المواد لجميع المراحل الدراسية.
24-12-2025 :: 00:00 - 00:00
آخر موعد للانسحاب من مادة أو أكثر أو من جميع المواد لجميع المراحل الدراسية.
كانون الأول
24
القبول والتسجيل
آخر موعد لتسجيل ساعات رسالة الماجستير (لأول مرة بعد اقرار المشروع وتعيين مشرف).
24-12-2025 :: 00:00 - 00:00
آخر موعد لتسجيل ساعات رسالة الماجستير (لأول مرة بعد اقرار المشروع وتعيين مشرف).
كانون الأول
25
القبول والتسجيل
عيد الميلاد المجيد.
25-12-2025 :: 00:00 - 00:00
عيد الميلاد المجيد.

الرئيسية
إتصل بنا
موقع الجامعة
أخبار البلقاء
جامعة البلقاء التطبيقية - المملكة الاردنية الهاشمية - السلط, الأردن
هاتف: 34911111,  فاكس: (962-5) 557518, 557349 ,  صندوق البريد:
البريد الإلكتروني : Agr@bau.edu.jo

©2019 جميع الحقوق محفوظة جامعة البلقاء التطبيقية تصميم وبرمجة مركز الحاسوب
إضغط هنا لمشاهدة أفضل إعدادات التصفح